THE SHORT ANSWER

If capacity truly limits sales, measure contribution per unit of the scarce resource.

Workshops and services with orders competing for the same hours.

The scarce resource changes the comparison

OpenStax includes capacity and incremental costs when evaluating orders. When accepting one prevents fulfillment of another, the contribution forgone also matters. The limiting resource may be a machine, certification or time slot, not all team hours.

Reference: OpenStax / Rice University · Accept or Reject a Special Order ↗

Calculate a priority you can execute

Subtract avoidable variable costs from price and divide by bottleneck hours. Verify sellable demand at that price. Include setup between batches, minimums and delivery commitments; a high ratio does not authorize breaking accepted orders.

The simple rule works best with one scarce resource and feasible product batches. Multiple constraints require a fuller production plan. First assess whether a small capacity improvement costs less than the additional contribution it lets you sell.

HYPOTHETICAL EXAMPLE

The highest unit contribution can lose

Fictional example. A contributes S/120 per unit and uses 3 machine hours. B contributes S/90 and uses 1.5 hours. There are 30 hours and enough demand.

  1. A: 120 ÷ 3 = S/40 per hour. B: 90 ÷ 1.5 = S/60 per hour.
  2. Only A: 30 ÷ 3 × 120 = S/1,200. Only B: 30 ÷ 1.5 × 90 = S/1,800.

B contributes S/600 more under these assumptions; demand and setup can change the result.

Illustrative MisSoles calculation. Not a quote or a promised return.

Mistakes you can avoid

  • Using total hours when only one machine is saturated.
  • Maximizing contribution using nonexistent sales.

Your next step

  1. Identify the observed bottleneck.
  2. Build a schedule with demand, setup and commitments.

Research scope

Content updated: 2026-11-25 · Partial review

  • Not optimization under multiple constraints; excludes new fixed costs.

AI-assisted writing; independent editorial review pending. Examples and decision frameworks are developed by MisSoles.

Sources, dates and coverage · 1
  • Accept or Reject a Special Order · OpenStax / Rice University

    Read: 2026-11-25 · Read November 25, 2026; retain source date and scope.

    Capacity and incremental contribution.

    The source supports the stated concept, not a quote, contract or personal situation. Scenarios and calculations are original.

Try your own numbers

Open related tool →

Keep learning